Amazon Disclosure Privacy Policy DMCA Policy Terms of Use Contact Us

Swinerton Renewable Energy expands operations with new San Diego headquarters

Share

U.S. solar contractor Swinerton Renewable Energy (SRE) recently opened its new headquarters in San Diego, California to accommodate a growing team.

Credit: Swinerton

SRE collaborated with ID Studios on the design, building upon a long-term partnership with the Solana Beach-based firm. SRE managed construction on the project and worked with the Swinerton self-perform trade experts on several stages of the build-out.

Construction on the office began in February 2020 and was completed in Spring 2021. The 25,000 sq-ft location expands on an existing 5,700 sq-ft operations and control center and office space that was completed in 2018.

Several large-scale graphics, including a “Solar 101” wall, reflect the SRE team’s creativity and commitment to STEM education. The space also houses the company’s 24-hour a day, 365-days a year operations and control center.

News item from Swinerton Renewable Energy

<!–
–>
Original Source: https://www.solarpowerworldonline.com/2021/08/swinerton-renewable-energy-expands-operations-with-new-san-diego-headquarters/