Amazon Disclosure Privacy Policy DMCA Policy Terms of Use Contact Us

200-MW solar project now producing power for Microsoft

Share

Leeward’s Horizon Solar Project.

Leeward Renewable Energy (LRE) has announced the completion and commercial operation of its 200-MW Morrow Lake Solar project. Located in Frio County, Texas, the project will provide Microsoft renewable energy under a previously announced long-term power purchase agreement.

Morrow Lake Solar is the first of two solar facilities developed under the agreement with Microsoft and is LRE’s second project in Frio County, located across from its 200-MW Horizon Solar project. Morrow Lake Solar created over 300 jobs during peak construction, with 112 being local hires. The project uses First Solar thin-film modules.

As part of LRE’s continued commitment to land stewardship, Morrow Lake Solar utilized robust practices that promote soil health, preserve native plant species, and enhance biodiversity, including the introduction of sheep grazing for vegetation control. The project also has supported various community programs, including educational initiatives and contributions to local events such as toy drives and holiday celebrations.

LRE acquired the Morrow Lake Solar Project in 2023 from Red River, a joint venture of SunChase and Eolian, which initiated the development of the Morrow Lake Solar Project in 2017.

News item from Leeward Renewable Energy

<!–
–>
Original Source: https://www.solarpowerworldonline.com/2024/12/200-mw-solar-project-now-producing-power-for-microsoft/